
Vinings Warehouse, Gloucester Docks
This landmark property in the heart of Gloucester’s historic docks underwent a complete transformation by the Outbrushed team. As a multi-occupancy residential block with significant heritage value, the project demanded a careful balance of craftsmanship, planning, and respect for its original character.
We were proud to be trusted with this large-scale job, helping preserve a piece of Gloucester’s architectural history — and making it look better than ever.
Comprehensive restoration and redecoration throughout the property:
-
Meticulous restoration and painting of 247 exterior windows
-
Full redecoration of all communal interior areas — including stairwells, walls, ceilings, and trim
-
Replacement and painting of fascia boards
-
Detailed cast iron restoration to preserve and protect historical features
-
Full scaffolding solution managed in-house to ensure safe, efficient access across the site
Our team used premium materials and traditional techniques where needed to match the building's historic fabric, delivering professional, long-lasting finishes inside and out.


Logistics, planning, and safety were key.
With over 50 privately owned flats and hundreds of pedestrians passing daily through the dockside area, this project required exceptional organisation.
We worked closely with residents, building managers, and local authorities to:
-
Coordinate works with minimal disruption to daily life
-
Maintain strict health & safety standards
-
Deliver all phases on time and to the highest standard
It was a complex project — but one that showcased what Outbrushed does best: combining quality workmanship with professional project management.


